The average wastewater flow is 3.9m3/s (88 mgd) and the sludge beds cover 78 ha (193 ac), demonstrating that the concept can also be effective in large scale operations. Reed Beds This concept combines the elements of an under- drained sand bed and a dense stand of vegetation in the sludge dewatering process
View More